Kay Bailey Hutchison Convention Center Dallas Master Plan Register Outreach Event Component 1 - GMP-02 Enabling Masonry
Sep
16

Kay Bailey Hutchison Convention Center Dallas Master Plan Register Outreach Event Component 1 - GMP-02 Enabling Masonry

You’re invited to an Outreach Event to explore subcontracting opportunities for Component 1 of the Kay Bailey Hutchison Convention Center Dallas Master Plan.

Project Scope: GMP-02 Enabling Masonry

The scope of work includes extending existing CMU walls to the structure above, constructing new CMU walls to the structure, and grouting existing CMU walls to the structure above. All work will be performed in close proximity to the DART and UPRR rail lines.

Register here: https://www.dallasccmasterplan.com/events

View Event →

Kay Bailey Hutchison Convention Center Dallas Master Plan Component 1 - GMP-01 Traffic Control Plan - General Requirements
Jul
31

Kay Bailey Hutchison Convention Center Dallas Master Plan Component 1 - GMP-01 Traffic Control Plan - General Requirements

You’re invited to an Outreach Event to explore subcontracting opportunities for Component 1 of the Kay Bailey Hutchison Convention Center Dallas Master Plan.

Project Scope – Traffic Control Plan (TCP) - General

Requirements

• Turnkey Traffic Control Plan Design & Permitting

• Installation & Maintenance of Traffic Control Plan

Components

• Mutiple-Phase Construction Closures

• Ongoing Coordination with City of Dallas, TxDOT &

Trinity Alliance

• Intermediate Graphic Exhibits & Public Information

• Restoration of Permanent Traffic Infrastructure

• Unit Pricing for Intermediate Phases & Additional

Services

• Deductive Alternate for Engineering Seals

• Temporary Signal & Lighting Modifications

• Schedule Phases (Aug 2025 – Mar 2029)

Visit the Kay Bailey Hutchison Master Plan site to register.

View Event →
Kay Bailey Hutchison Convention Center Dallas Master Plan Matchmaking Component 1 - Foundations and Concrete Matchmaking Event
Jun
27

Kay Bailey Hutchison Convention Center Dallas Master Plan Matchmaking Component 1 - Foundations and Concrete Matchmaking Event

Join us on June 27 for the Foundations and Concrete Matchmaking Event for Component 1 of the Kay Bailey Hutchison Convention Center Dallas Master Plan. This is a fantastic opportunity to explore subcontracting possibilities and connect with industry leaders.

Visit the Kay Bailey Hutchinson Master Plan site to register.

View Event →
Kay Bailey Hutchinson Convention Center Master -GMP-04 - Foundations & Concrete Plan
Jun
16

Kay Bailey Hutchinson Convention Center Master -GMP-04 - Foundations & Concrete Plan

You're invited to an Outreach Event to explore subcontracting opportunities for Component 1 of the Kay Bailey Hutchinson Convention Center Dallas Master Plan - GMP-04 Foundations and Concrete.

Project Scope - GMP-04: Drilled Foundations; Grade Beams; Slabs on Grade; Elevated Concrete Loading Dock Deck & Columns; Concrete Ramps; and Concrete on Metal Deck. 

Register here: https://forms.cloud.microsoft/Pages/ResponsePage.aspx?id=AHfiIHC2U0WifNjiWDsyiZ0rCUxbIxZFpo1vLSarlPJURUZESEVYOFpINVUwOTQzTzcxUkNJSVI1Ri4u


View Event →
Kay Bailey Hutchison Convention Center Master Plan REGISTER FOR THE MATCHMAKING Component 1 - Structural Steel Matchmaking Event
Jun
2

Kay Bailey Hutchison Convention Center Master Plan REGISTER FOR THE MATCHMAKING Component 1 - Structural Steel Matchmaking Event

You’re invited to a Matchmaking Event to explore Structural Steel Package subcontracting opportunities for Component 1 of the Kay Bailey Hutchison Convention Center Dallas Master Plan.

Register: https://forms.office.com/pages/responsepage.aspx?id=AHfiIHC2U0WifNjiWDsyiXbgkibwM9ROpUSgZzYEzhhURDRRS0E5NjRPSEk4WkVTWlJZVkpEVE9ZMS4u&route=shorturl

View Event →
Kay Bailey Hutchison Convention Center Master Plan - Component 1 - GMP-03 Structural Steel
May
15

Kay Bailey Hutchison Convention Center Master Plan - Component 1 - GMP-03 Structural Steel

You’re invited to an Outreach Event to explore subcontracting opportunities for Component 1 of the Kay Bailey Hutchison Convention Center Dallas Master Plan - GMP-03 Structural Steel (Zones A & B).

Project Scope – GMP-03:

• Structural Steel (Zones A & B)

• Structural Steel Preconstruction Assistance

• Mill Order Coordination w/Structural Engineer

• Initial Budget Development to Final GMP

• Alternate for Miscellaneous Iron

• Alternate for Zones C and D

Register here!

View Event →
Kay Bailey Hutchison Convention Center Master Plan Component 1 - GMP-02 Enabling Works
Apr
22

Kay Bailey Hutchison Convention Center Master Plan Component 1 - GMP-02 Enabling Works

Join us for a Pre-Bid Site Walk to explore opportunities to become a subcontractor for Component 1 of the Kay Bailey Hutchison Convention Center Dallas Master Plan - GMP-02 Enabling Works. Bids are due by 2 PM on May 6, 2025.

Project Scope – GMP-02 Enabling Works:

• Abatement & Demolition of Exhibit Halls D, E, and F

• Utility Preservation & Relocation for Halls B and C

• Integration of the Existing DART Station into the demolition scope while maintaining transit operations

• New Construction: Hall C renovations & façade construction at Hall C/D connection

Anticipated Trade Packages:

• 2-02.41 Abatement and Demolition

• 2-05.10 Structural Steel

• 2-07.10 Waterproofing

• 2-07.26 EIFS/Stucco

• 2-07.50 Roofing

• 2-07.55 Metal Roofing

• 2-07.60 Metal Panels

• 2-08.10 Doors, Frames & Hardware

• 2-09.20 Drywall

• 2-09.60 Resilient, Carpet, Base

• 2-09.90 Painting

• 2-10.55 Prefabricated Guard Shack

• 2-21.00 Fire Protection

• 2-23.00 Mechanical/Plumbing

• 2-26.00 Electrical/Fire Alarm

• 2-26.50 Traffic Signals & Street Lights

• 2-31.00 Erosion Control

• 2-32.31 Chain Link Fencing

Register: https://lnkd.in/gKNv2Pvr

View Event →
Component 1 of the Kay Bailey Hutchison Convention Center Dallas Master Plan- GMP-02 Enabling Works
Apr
8

Component 1 of the Kay Bailey Hutchison Convention Center Dallas Master Plan- GMP-02 Enabling Works

Join Trinity Alliance Dallas on Tuesday, April 8, for an outreach event to explore subcontracting opportunities for Component 1 of the Kay Bailey Hutchison Convention Center Dallas Master Plan- GMP-02 Enabling Works:

Project Scope – GMP-02 Enabling Works:

• Abatement & Demolition of Exhibit Halls D, E, and F

• Utility Preservation & Relocation for Halls B and C

• Integration of the Existing DART Station into the

demolition scope while maintaining transit operations

• New Construction: Hall C renovations & façade

construction at Hall C/D connection

Anticipated Trade Packages:

• Abatement and Demolition (2-02.41)

• Waterproofing (2-07.10) – Building Separation

• EIFS/Stucco (2-07.26) – Building Separation

• Roofing (2-07.50) – Building Separation

• Metal Panels (2-07.60) – Building Separation

• Drywall (2-09.20) – Building Separation

• Fire Protection (2-21.00) – Building Separation

• Mechanical/Plumbing (2-23.00) – Building Separation

• Electrical/Fire Alarm (2-26.00) – Building Separation

• Chain Link Fencing (2-32.31) – Building Separation

Register here: https://lnkd.in/gr9A6W4F

View Event →
Pre-Bid Site Walk
Mar
18

Pre-Bid Site Walk

Join Trinity Alliance Dallas on Tuesday, March 18, for a Pre-Bid Site Walk to explore opportunities to become a subcontractor for Component 1 of the Kay Bailey Hutchison Convention Center Dallas Master Plan:

Truck Ramp and Stair Modification

MDF Relocation

Security Office Relocation

Chilled Water Bypass Loop Rough In

Temporary Chiller and Feeds

Reconfigure Power/ Data in Floor Boxes at West End of Hall C

View Event →
Subcontractor Outreach Event (Session Two)
Feb
27

Subcontractor Outreach Event (Session Two)

Join us for an outreach event to learn how to become a subcontractor for the Kay Bailey Hutchison Convention Center Dallas project. The divisions of work associated with the Early Enabling Bid Package includes the following:

Truck Ramp and Stair Modification, MDF Relocation, Security Office Relocation, Chilled Water Bypass Loop Rough in, Temporary Chiller and Feeds, Reconfigure Power/Data in Floor Boxes at West End of Hall C

View Event →
Subcontractor Outreach Event (Session One)
Feb
27

Subcontractor Outreach Event (Session One)

Join us for an outreach event to learn how to become a subcontractor for the Kay Bailey Hutchison Convention Center Dallas project. The divisions of work associated with the Early Enabling Bid Package includes the following:

Truck Ramp and Stair Modification, MDF Relocation, Security Office Relocation, Chilled Water Bypass Loop Rough in, Temporary Chiller and Feeds, Reconfigure Power/Data in Floor Boxes at West End of Hall C

View Event →
Subcontractor Outreach Event (session two)
Feb
26

Subcontractor Outreach Event (session two)

Join us for an outreach event to learn how to become a subcontractor for the Kay Bailey Hutchison Convention Center Dallas project. The divisions of work associated with the Early Enabling Bid Package includes the following:

Truck Ramp and Stair Modification, MDF Relocation, Security Office Relocation, Chilled Water Bypass Loop Rough in, Temporary Chiller and Feeds, Reconfigure Power/Data in Floor Boxes at West End of Hall C

View Event →
Subcontractor Outreach Event (Session one)
Feb
26

Subcontractor Outreach Event (Session one)

Join us for an outreach event to learn how to become a subcontractor for the Kay Bailey Hutchison Convention Center Dallas project. The divisions of work associated with the Early Enabling Bid Package includes the following:

Truck Ramp and Stair Modification MDF Relocation Security Office Relocation Chilled Water Bypass Loop Rough in Temporary Chiller and Feeds Reconfigure Power/Data in Floor Boxes at West End of Hall C

View Event →