
Kay Bailey Hutchinson Convention Center Master -GMP-04 - Foundations & Concrete Plan
You're invited to an Outreach Event to explore subcontracting opportunities for Component 1 of the Kay Bailey Hutchinson Convention Center Dallas Master Plan - GMP-04 Foundations and Concrete.
Project Scope - GMP-04: Drilled Foundations; Grade Beams; Slabs on Grade; Elevated Concrete Loading Dock Deck & Columns; Concrete Ramps; and Concrete on Metal Deck.
Register here: https://forms.cloud.microsoft/Pages/ResponsePage.aspx?id=AHfiIHC2U0WifNjiWDsyiZ0rCUxbIxZFpo1vLSarlPJURUZESEVYOFpINVUwOTQzTzcxUkNJSVI1Ri4u

Kay Bailey Hutchison Convention Center Master Plan REGISTER FOR THE MATCHMAKING Component 1 - Structural Steel Matchmaking Event
You’re invited to a Matchmaking Event to explore Structural Steel Package subcontracting opportunities for Component 1 of the Kay Bailey Hutchison Convention Center Dallas Master Plan.
Register: https://forms.office.com/pages/responsepage.aspx?id=AHfiIHC2U0WifNjiWDsyiXbgkibwM9ROpUSgZzYEzhhURDRRS0E5NjRPSEk4WkVTWlJZVkpEVE9ZMS4u&route=shorturl

Kay Bailey Hutchison Convention Center Master Plan - Component 1 - GMP-03 Structural Steel
You’re invited to an Outreach Event to explore subcontracting opportunities for Component 1 of the Kay Bailey Hutchison Convention Center Dallas Master Plan - GMP-03 Structural Steel (Zones A & B).
Project Scope – GMP-03:
• Structural Steel (Zones A & B)
• Structural Steel Preconstruction Assistance
• Mill Order Coordination w/Structural Engineer
• Initial Budget Development to Final GMP
• Alternate for Miscellaneous Iron
• Alternate for Zones C and D

Matchmaking Event
Join us for a Matchmaking Event on Monday, May 5th from 9:30 a.m. to 11 a.m. to explore Demolition Package subcontracting opportunities for Component 1 of the Kay Bailey Hutchison Convention Center Dallas Master Plan.
Register for the Matchmaking Event: https://lnkd.in/gAnce8YW

Kay Bailey Hutchison Convention Center Master Plan Component 1 - GMP-02 Enabling Works
Join us for a Pre-Bid Site Walk to explore opportunities to become a subcontractor for Component 1 of the Kay Bailey Hutchison Convention Center Dallas Master Plan - GMP-02 Enabling Works. Bids are due by 2 PM on May 6, 2025.
Project Scope – GMP-02 Enabling Works:
• Abatement & Demolition of Exhibit Halls D, E, and F
• Utility Preservation & Relocation for Halls B and C
• Integration of the Existing DART Station into the demolition scope while maintaining transit operations
• New Construction: Hall C renovations & façade construction at Hall C/D connection
Anticipated Trade Packages:
• 2-02.41 Abatement and Demolition
• 2-05.10 Structural Steel
• 2-07.10 Waterproofing
• 2-07.26 EIFS/Stucco
• 2-07.50 Roofing
• 2-07.55 Metal Roofing
• 2-07.60 Metal Panels
• 2-08.10 Doors, Frames & Hardware
• 2-09.20 Drywall
• 2-09.60 Resilient, Carpet, Base
• 2-09.90 Painting
• 2-10.55 Prefabricated Guard Shack
• 2-21.00 Fire Protection
• 2-23.00 Mechanical/Plumbing
• 2-26.00 Electrical/Fire Alarm
• 2-26.50 Traffic Signals & Street Lights
• 2-31.00 Erosion Control
• 2-32.31 Chain Link Fencing
Register: https://lnkd.in/gKNv2Pvr

Component 1 of the Kay Bailey Hutchison Convention Center Dallas Master Plan- GMP-02 Enabling Works
Join Trinity Alliance Dallas on Tuesday, April 8, for an outreach event to explore subcontracting opportunities for Component 1 of the Kay Bailey Hutchison Convention Center Dallas Master Plan- GMP-02 Enabling Works:
Project Scope – GMP-02 Enabling Works:
• Abatement & Demolition of Exhibit Halls D, E, and F
• Utility Preservation & Relocation for Halls B and C
• Integration of the Existing DART Station into the
demolition scope while maintaining transit operations
• New Construction: Hall C renovations & façade
construction at Hall C/D connection
Anticipated Trade Packages:
• Abatement and Demolition (2-02.41)
• Waterproofing (2-07.10) – Building Separation
• EIFS/Stucco (2-07.26) – Building Separation
• Roofing (2-07.50) – Building Separation
• Metal Panels (2-07.60) – Building Separation
• Drywall (2-09.20) – Building Separation
• Fire Protection (2-21.00) – Building Separation
• Mechanical/Plumbing (2-23.00) – Building Separation
• Electrical/Fire Alarm (2-26.00) – Building Separation
• Chain Link Fencing (2-32.31) – Building Separation
Register here: https://lnkd.in/gr9A6W4F

Pre-Bid Site Walk
Join Trinity Alliance Dallas on Tuesday, March 18, for a Pre-Bid Site Walk to explore opportunities to become a subcontractor for Component 1 of the Kay Bailey Hutchison Convention Center Dallas Master Plan:
Truck Ramp and Stair Modification
MDF Relocation
Security Office Relocation
Chilled Water Bypass Loop Rough In
Temporary Chiller and Feeds
Reconfigure Power/ Data in Floor Boxes at West End of Hall C

Subcontractor Outreach Event (Session Two)
Join us for an outreach event to learn how to become a subcontractor for the Kay Bailey Hutchison Convention Center Dallas project. The divisions of work associated with the Early Enabling Bid Package includes the following:
Truck Ramp and Stair Modification, MDF Relocation, Security Office Relocation, Chilled Water Bypass Loop Rough in, Temporary Chiller and Feeds, Reconfigure Power/Data in Floor Boxes at West End of Hall C

Subcontractor Outreach Event (Session One)
Join us for an outreach event to learn how to become a subcontractor for the Kay Bailey Hutchison Convention Center Dallas project. The divisions of work associated with the Early Enabling Bid Package includes the following:
Truck Ramp and Stair Modification, MDF Relocation, Security Office Relocation, Chilled Water Bypass Loop Rough in, Temporary Chiller and Feeds, Reconfigure Power/Data in Floor Boxes at West End of Hall C

Subcontractor Outreach Event (session two)
Join us for an outreach event to learn how to become a subcontractor for the Kay Bailey Hutchison Convention Center Dallas project. The divisions of work associated with the Early Enabling Bid Package includes the following:
Truck Ramp and Stair Modification, MDF Relocation, Security Office Relocation, Chilled Water Bypass Loop Rough in, Temporary Chiller and Feeds, Reconfigure Power/Data in Floor Boxes at West End of Hall C

Subcontractor Outreach Event (Session one)
Join us for an outreach event to learn how to become a subcontractor for the Kay Bailey Hutchison Convention Center Dallas project. The divisions of work associated with the Early Enabling Bid Package includes the following:
Truck Ramp and Stair Modification MDF Relocation Security Office Relocation Chilled Water Bypass Loop Rough in Temporary Chiller and Feeds Reconfigure Power/Data in Floor Boxes at West End of Hall C