Join us for a Pre-Bid Site Walk to explore opportunities to become a subcontractor for Component 1 of the Kay Bailey Hutchison Convention Center Dallas Master Plan - GMP-02 Enabling Works. Bids are due by 2 PM on May 6, 2025.
Project Scope – GMP-02 Enabling Works:
• Abatement & Demolition of Exhibit Halls D, E, and F
• Utility Preservation & Relocation for Halls B and C
• Integration of the Existing DART Station into the demolition scope while maintaining transit operations
• New Construction: Hall C renovations & façade construction at Hall C/D connection
Anticipated Trade Packages:
• 2-02.41 Abatement and Demolition
• 2-05.10 Structural Steel
• 2-07.10 Waterproofing
• 2-07.26 EIFS/Stucco
• 2-07.50 Roofing
• 2-07.55 Metal Roofing
• 2-07.60 Metal Panels
• 2-08.10 Doors, Frames & Hardware
• 2-09.20 Drywall
• 2-09.60 Resilient, Carpet, Base
• 2-09.90 Painting
• 2-10.55 Prefabricated Guard Shack
• 2-21.00 Fire Protection
• 2-23.00 Mechanical/Plumbing
• 2-26.00 Electrical/Fire Alarm
• 2-26.50 Traffic Signals & Street Lights
• 2-31.00 Erosion Control
• 2-32.31 Chain Link Fencing