Filtering by: “Workforce”

Kay Bailey Hutchison Convention Center Master Plan Component 1 - GMP-02 Enabling Works
Apr
22

Kay Bailey Hutchison Convention Center Master Plan Component 1 - GMP-02 Enabling Works

Join us for a Pre-Bid Site Walk to explore opportunities to become a subcontractor for Component 1 of the Kay Bailey Hutchison Convention Center Dallas Master Plan - GMP-02 Enabling Works. Bids are due by 2 PM on May 6, 2025.

Project Scope – GMP-02 Enabling Works:

• Abatement & Demolition of Exhibit Halls D, E, and F

• Utility Preservation & Relocation for Halls B and C

• Integration of the Existing DART Station into the demolition scope while maintaining transit operations

• New Construction: Hall C renovations & façade construction at Hall C/D connection

Anticipated Trade Packages:

• 2-02.41 Abatement and Demolition

• 2-05.10 Structural Steel

• 2-07.10 Waterproofing

• 2-07.26 EIFS/Stucco

• 2-07.50 Roofing

• 2-07.55 Metal Roofing

• 2-07.60 Metal Panels

• 2-08.10 Doors, Frames & Hardware

• 2-09.20 Drywall

• 2-09.60 Resilient, Carpet, Base

• 2-09.90 Painting

• 2-10.55 Prefabricated Guard Shack

• 2-21.00 Fire Protection

• 2-23.00 Mechanical/Plumbing

• 2-26.00 Electrical/Fire Alarm

• 2-26.50 Traffic Signals & Street Lights

• 2-31.00 Erosion Control

• 2-32.31 Chain Link Fencing

Register: https://lnkd.in/gKNv2Pvr

View Event →
Component 1 of the Kay Bailey Hutchison Convention Center Dallas Master Plan- GMP-02 Enabling Works
Apr
8

Component 1 of the Kay Bailey Hutchison Convention Center Dallas Master Plan- GMP-02 Enabling Works

Join Trinity Alliance Dallas on Tuesday, April 8, for an outreach event to explore subcontracting opportunities for Component 1 of the Kay Bailey Hutchison Convention Center Dallas Master Plan- GMP-02 Enabling Works:

Project Scope – GMP-02 Enabling Works:

• Abatement & Demolition of Exhibit Halls D, E, and F

• Utility Preservation & Relocation for Halls B and C

• Integration of the Existing DART Station into the

demolition scope while maintaining transit operations

• New Construction: Hall C renovations & façade

construction at Hall C/D connection

Anticipated Trade Packages:

• Abatement and Demolition (2-02.41)

• Waterproofing (2-07.10) – Building Separation

• EIFS/Stucco (2-07.26) – Building Separation

• Roofing (2-07.50) – Building Separation

• Metal Panels (2-07.60) – Building Separation

• Drywall (2-09.20) – Building Separation

• Fire Protection (2-21.00) – Building Separation

• Mechanical/Plumbing (2-23.00) – Building Separation

• Electrical/Fire Alarm (2-26.00) – Building Separation

• Chain Link Fencing (2-32.31) – Building Separation

Register here: https://lnkd.in/gr9A6W4F

View Event →
Pre-Bid Site Walk
Mar
18

Pre-Bid Site Walk

Join Trinity Alliance Dallas on Tuesday, March 18, for a Pre-Bid Site Walk to explore opportunities to become a subcontractor for Component 1 of the Kay Bailey Hutchison Convention Center Dallas Master Plan:

Truck Ramp and Stair Modification

MDF Relocation

Security Office Relocation

Chilled Water Bypass Loop Rough In

Temporary Chiller and Feeds

Reconfigure Power/ Data in Floor Boxes at West End of Hall C

View Event →
Subcontractor Outreach Event (Session Two)
Feb
27

Subcontractor Outreach Event (Session Two)

Join us for an outreach event to learn how to become a subcontractor for the Kay Bailey Hutchison Convention Center Dallas project. The divisions of work associated with the Early Enabling Bid Package includes the following:

Truck Ramp and Stair Modification, MDF Relocation, Security Office Relocation, Chilled Water Bypass Loop Rough in, Temporary Chiller and Feeds, Reconfigure Power/Data in Floor Boxes at West End of Hall C

View Event →
Subcontractor Outreach Event (Session One)
Feb
27

Subcontractor Outreach Event (Session One)

Join us for an outreach event to learn how to become a subcontractor for the Kay Bailey Hutchison Convention Center Dallas project. The divisions of work associated with the Early Enabling Bid Package includes the following:

Truck Ramp and Stair Modification, MDF Relocation, Security Office Relocation, Chilled Water Bypass Loop Rough in, Temporary Chiller and Feeds, Reconfigure Power/Data in Floor Boxes at West End of Hall C

View Event →
Subcontractor Outreach Event (session two)
Feb
26

Subcontractor Outreach Event (session two)

Join us for an outreach event to learn how to become a subcontractor for the Kay Bailey Hutchison Convention Center Dallas project. The divisions of work associated with the Early Enabling Bid Package includes the following:

Truck Ramp and Stair Modification, MDF Relocation, Security Office Relocation, Chilled Water Bypass Loop Rough in, Temporary Chiller and Feeds, Reconfigure Power/Data in Floor Boxes at West End of Hall C

View Event →
Subcontractor Outreach Event (Session one)
Feb
26

Subcontractor Outreach Event (Session one)

Join us for an outreach event to learn how to become a subcontractor for the Kay Bailey Hutchison Convention Center Dallas project. The divisions of work associated with the Early Enabling Bid Package includes the following:

Truck Ramp and Stair Modification MDF Relocation Security Office Relocation Chilled Water Bypass Loop Rough in Temporary Chiller and Feeds Reconfigure Power/Data in Floor Boxes at West End of Hall C

View Event →